Mark A, What is on Vaughns do to list?
All I know is that he is working on making those 40mm handles and is making the connecting rod for the port side gear boxes. On May 3rd, the plan is to have that all done and he is going to install all of that on the 40mm. We should, by the end of the day on the 3rd be able to move the gun by hand.
After that...I'm not sure what he has in store. I've talked to him about a new motor for the SJ mast...and maybe might have him look into the option of rigging out the bow planes. These two things are not set...just stuff we've talked about.
If you got something you need, go for it...all I need him for on the 3rd is a little bit of welding...maybe an hours worth of his time.